1 00:00:03,710 --> 00:00:02,960 so we're starting by zooming in on the 2 00:00:06,110 --> 00:00:03,720 airlock 3 00:00:10,820 --> 00:00:06,120 this is where eveyone and ev2 will 4 00:00:13,070 --> 00:00:10,830 egress to begin the e VA eveyone will 5 00:00:15,740 --> 00:00:13,080 egress first he'll be the one wearing 6 00:00:18,349 --> 00:00:15,750 the red stripes and he'll bring some 7 00:00:21,560 --> 00:00:18,359 tools and equipment for the SSU R&R with 8 00:00:23,990 --> 00:00:21,570 him it'll be followed by ev2 tim peake 9 00:00:26,359 --> 00:00:24,000 and the white stripes tim peake will be 10 00:00:29,660 --> 00:00:26,369 carrying their spare SSU out to the work 11 00:00:31,339 --> 00:00:29,670 site before the crew leave the vicinity 12 00:00:32,990 --> 00:00:31,349 of the airlock they'll takes a few 13 00:00:34,490 --> 00:00:33,000 moments to attempt stow some other tools 14 00:00:36,410 --> 00:00:34,500 and equipment for subsequent evie a 15 00:00:38,959 --> 00:00:36,420 tasks on the outside the airlock where 16 00:00:39,560 --> 00:00:38,969 they're easily accessible once that's 17 00:00:41,330 --> 00:00:39,570 complete 18 00:00:43,400 --> 00:00:41,340 eveyone will translate to the starboard 19 00:00:45,619 --> 00:00:43,410 c2 cart where he will retrieve a foot 20 00:00:51,229 --> 00:00:45,629 restraint which he'll use for worksite 21 00:00:53,360 --> 00:00:51,239 stabilization at the SSU once he has 22 00:00:55,040 --> 00:00:53,370 retrieved the foot restraint he will 23 00:00:56,959 --> 00:00:55,050 connect the safety tether anchors for 24 00:00:59,479 --> 00:00:56,969 both crew members to handrails on the 25 00:01:01,340 --> 00:00:59,489 end of the s-1 truss segment connecting 26 00:01:02,959 --> 00:01:01,350 the safety tethers anchors out here will 27 00:01:05,420 --> 00:01:02,969 enable them to reach all the way to the 28 00:01:09,170 --> 00:01:05,430 SSU worksite which is on the far end of 29 00:01:12,320 --> 00:01:09,180 the truss eveyone will then translate to 30 00:01:13,929 --> 00:01:12,330 the SSU worksite where he will install 31 00:01:16,310 --> 00:01:13,939 and set up the foot restraint 32 00:01:20,120 --> 00:01:16,320 positioning it to give him good access 33 00:01:22,190 --> 00:01:20,130 to the SSU itself once that's complete 34 00:01:23,420 --> 00:01:22,200 he'll stow the tools and equipment he 35 00:01:29,630 --> 00:01:23,430 brought with him where they're easily 36 00:01:34,880 --> 00:01:29,640 accessible meanwhile evie 2 will also 37 00:01:36,710 --> 00:01:34,890 translate to the SSU worksite and when 38 00:01:40,130 --> 00:01:36,720 he arrives he will work to stow the 39 00:01:42,710 --> 00:01:40,140 spare SSU where it's within easy reach 40 00:01:45,109 --> 00:01:42,720 for the R&R he'll then position himself 41 00:01:48,020 --> 00:01:45,119 where he can get good visuals on the SSU 42 00:01:49,749 --> 00:01:48,030 worksite and easily access the tools and 43 00:01:52,609 --> 00:01:49,759 equipment that have been brought out 44 00:01:55,310 --> 00:01:52,619 eveyone will ingress the foot restraint 45 00:01:59,600 --> 00:01:55,320 and verify that he's in a good position 46 00:02:02,389 --> 00:01:59,610 for the SSU our and our crew will wait 47 00:02:05,780 --> 00:02:02,399 for the beginning of night and when that 48 00:02:07,969 --> 00:02:05,790 occurs they'll begin the SSU R&R eveyone 49 00:02:11,150 --> 00:02:07,979 will remove the failed SSU and present 50 00:02:13,320 --> 00:02:11,160 it to ev2 for inspection then stow it on 51 00:02:15,930 --> 00:02:13,330 his BRT so it's out of the way 52 00:02:19,580 --> 00:02:15,940 as the crew retrieves the spare SSU from 53 00:02:28,070 --> 00:02:23,550 eveyone will then install the spare SSU 54 00:02:33,660 --> 00:02:30,900 once that's complete the crew will work 55 00:02:36,060 --> 00:02:33,670 together to put the failed SSU back in 56 00:02:39,120 --> 00:02:36,070 the bag that the spare SSU originally 57 00:02:40,550 --> 00:02:39,130 came out in which Evy - will carry back 58 00:02:42,960 --> 00:02:40,560 to the airlock 59 00:02:45,210 --> 00:02:42,970 eveyone will work to clean up the work 60 00:02:47,220 --> 00:02:45,220 site and then we'll follow Evie - back 61 00:02:50,100 --> 00:02:47,230 to the airlock dropping off the foot 62 00:02:52,020 --> 00:02:50,110 restraint on his way Evie - will place 63 00:02:55,380 --> 00:02:52,030 the failed SSU back inside the airlock 64 00:02:57,960 --> 00:02:55,390 and be joined by eveyone eveyone will 65 00:03:00,240 --> 00:02:57,970 chain trade out some equipment and then 66 00:03:03,300 --> 00:03:00,250 begin his translation to the NPV work 67 00:03:06,180 --> 00:03:03,310 site for the next task on the way to 68 00:03:08,970 --> 00:03:06,190 this work site eveyone will stop and 69 00:03:11,310 --> 00:03:08,980 drop a cable on the support side of z1 70 00:03:13,530 --> 00:03:11,320 it'll be waiting here for Evie - to 71 00:03:15,420 --> 00:03:13,540 connect later in the Evie a then eveyone 72 00:03:17,520 --> 00:03:15,430 will continue to the NPV this is a non 73 00:03:21,000 --> 00:03:17,530 propulsive vent work site will he'll be 74 00:03:23,460 --> 00:03:21,010 installing this nan for pulse event in 75 00:03:25,620 --> 00:03:23,470 order to install the NPV he will first 76 00:03:27,570 --> 00:03:25,630 remove a cover plate that was installed 77 00:03:31,530 --> 00:03:27,580 on the same location where the NPV goes 78 00:03:34,259 --> 00:03:31,540 and then place the end PV on the end of 79 00:03:36,630 --> 00:03:34,269 node 3 here we have some NBL video of 80 00:03:39,090 --> 00:03:36,640 the crew practicing this task you can 81 00:03:41,280 --> 00:03:39,100 see that the clearance between node 3 82 00:03:44,479 --> 00:03:41,290 and p.m. M is very tight making this a 83 00:03:47,850 --> 00:03:44,489 challenging work site for the Evie crew 84 00:03:50,070 --> 00:03:47,860 once installation of the NPV is complete 85 00:03:52,590 --> 00:03:50,080 eveyone will translate to the aft side 86 00:03:56,490 --> 00:03:52,600 of the vehicle and specifically to the 87 00:03:59,940 --> 00:03:56,500 aft side of p.m. a3 here he will release 88 00:04:01,949 --> 00:03:59,950 a p.m. a3 launch restraint bracket this 89 00:04:03,710 --> 00:04:01,959 will free some cables which will be 90 00:04:06,509 --> 00:04:03,720 disconnected on a subsequent EBA 91 00:04:09,289 --> 00:04:06,519 allowing the p.m. a3 to be relocated to 92 00:04:12,300 --> 00:04:09,299 an alternate location on space station 93 00:04:14,130 --> 00:04:12,310 once this is complete eveyone will 94 00:04:16,199 --> 00:04:14,140 translate back to the airlock where he 95 00:04:18,630 --> 00:04:16,209 will drop off the tools and equipment he 96 00:04:20,729 --> 00:04:18,640 used for the NPV and pick up an empty 97 00:04:23,460 --> 00:04:20,739 bag which you will use for the retrieval 98 00:04:26,320 --> 00:04:23,470 of the cp9 luminaire so that's camera 99 00:04:28,300 --> 00:04:26,330 port 9 the light has 100 00:04:31,420 --> 00:04:28,310 some burned-out light bulbs so he'll 101 00:04:33,159 --> 00:04:31,430 translate out to this worksite I've 102 00:04:36,430 --> 00:04:33,169 retrieved the luminaire which you can 103 00:04:38,890 --> 00:04:36,440 see here in white and he'll place that 104 00:04:43,390 --> 00:04:38,900 luminaire in the bag he brought out with 105 00:04:45,610 --> 00:04:43,400 him once he has retrieved the Lehmann 106 00:04:47,589 --> 00:04:45,620 air he'll do a few cleanup tasks at the 107 00:04:53,020 --> 00:04:47,599 worksite and then translate back to the 108 00:04:56,290 --> 00:04:53,030 airlock meanwhile evey two will have 109 00:04:58,570 --> 00:04:56,300 retrieved the ID a cable bag so this bag 110 00:05:01,330 --> 00:04:58,580 contains a cable which hat which will be 111 00:05:04,899 --> 00:05:01,340 used to provide power and data to the ID 112 00:05:06,670 --> 00:05:04,909 a an international docking adaptor Eevee 113 00:05:09,670 --> 00:05:06,680 two will translate to the nadir side of 114 00:05:11,980 --> 00:05:09,680 the lab attempt stow the cable bag and 115 00:05:14,290 --> 00:05:11,990 begin routing the cable first he'll 116 00:05:17,670 --> 00:05:14,300 route a leg of it aft to node one and 117 00:05:20,529 --> 00:05:17,680 connect on the nadir side of node one 118 00:05:22,570 --> 00:05:20,539 he'll then retrieved the epoch MDM leg 119 00:05:25,839 --> 00:05:22,580 of this cable and route it zenith on the 120 00:05:28,689 --> 00:05:25,849 lab and then port across the vehicle as 121 00:05:30,909 --> 00:05:28,699 you can see from this flyby one of the 122 00:05:32,529 --> 00:05:30,919 key challenges Eevee to Tim Peake will 123 00:05:34,269 --> 00:05:32,539 face during this portion of the EBA will 124 00:05:35,890 --> 00:05:34,279 be the tightness of the translation path 125 00:05:39,899 --> 00:05:35,900 and the number of other cables that 126 00:05:42,550 --> 00:05:39,909 present snag hazards for him as he goes 127 00:05:45,309 --> 00:05:42,560 once he is completed routing the cable 128 00:05:48,430 --> 00:05:45,319 to the port side of z1 he will connect 129 00:05:50,950 --> 00:05:48,440 it to the white r2 the epoch mbm cable 130 00:05:54,490 --> 00:05:50,960 which eveyone left for him earlier on 131 00:05:57,879 --> 00:05:54,500 the e VA he'll also make two connections 132 00:05:59,619 --> 00:05:57,889 of the epic MDM cable two pigtails that 133 00:06:02,050 --> 00:05:59,629 were left out on another cable called 134 00:06:05,309 --> 00:06:02,060 the MLM Ethernet cable on a previous e 135 00:06:12,909 --> 00:06:08,379 once this is complete he will return to 136 00:06:15,670 --> 00:06:12,919 the ID a cable bag and retrieved the 137 00:06:17,439 --> 00:06:15,680 third and final leg of the ID a cable 138 00:06:20,070 --> 00:06:17,449 which he'll route forward along the lab 139 00:06:22,420 --> 00:06:20,080 and then zenith and forward on node two 140 00:06:25,209 --> 00:06:22,430 leaving it for eventual connection to 141 00:06:27,010 --> 00:06:25,219 the International docking adaptor once 142 00:06:28,600 --> 00:06:27,020 this is complete he will clean up his